Algoma Central Public Timetable – May 13, 1995

This is the public timetable for the Algoma Central Railway, effective May 13, 1995 to October 9, 1995.

It is a small 3 panel foldout sheet of paper, printed on both sides.

At this time there was a regular passenger train running from Saulte Ste Marie all the way to Hearst (trains 1 & 2) running six days a week.

Since this is a summer timetable, the Wilderness Tour train was running daily between Sault Ste. Marie and Canyon (trains 3 & 4).