Chasing NBSR 121

I was in Saint John on October 16, 2026, having chased NBSR 120 from Fredericton Junction earlier in the morning. Its counterpart NBSR 121 was leaving Saint John so I waited around for its departure.

Its departure was delayed a bit because of an issue with a ballast train in Harvey, NB.

I tried setting up just west of the Dever Road yard, here, but there was no good place to park and the road traffic was a bit terrifying. I decided to go a bit further west (here).

After standing out in the drizzle for several minutes, NBSR 121 rounded the bend at 2:19 PM.

I was standing at Janes Way Lane, which made me think of Star Trek:Voyager and Captain Janeway. I’m pretty sure the lane predates the TV show.

NBSR 121 had three locomotives, all SD70M-2 units: 6410, lettered for NB Southern; 6412 lettered for the Maine Northern; and 6408 lettered for the Eastern Maine Railroad. There was good representation of the entire system on this train!

The next two locations were repeated from my NBSR 120 chase, just facing the other direction.

This next photo was taken at Station Street in “downtown” Grand Bay with my long lens… a quick grab shot before getting back in the car.

I removed an overhead wire from the photo.

Next, I decided to try the overhead shot at Westfield Beach, facing the other way. I parked and went up on the highway 102 overpass, only to find that there was no walkway on the side I wanted to shoot at.

I didn’t have much time to decide, and I was there already. I knew the road wasn’t super busy but it was active, so I squeezed against the edge and took the photo. A vehicle did go by while I was there but fortunately they were the only one on the bridge at the time. I don’t think I would do that shot again.

Looking left and right, I ran across the road to get the “going away” shot, on the pedestrian walkway this time.

Next up was Welsford.

When I arrived at this location, someone was standing well back from the road and tracks, wearing headphones. I wasn’t sure what they were doing there. I parked and waited for the train to arrive.

It turns out they were also there to record the train and I parked right in their shot. I felt and still feel terrible about it.

Next up was Douglas Lake, again. Another quick series of shots, because I wanted to get to Clarendon.

It would have been nice to get clear shots of all three units, but there is too much brush and trees in the way here.

I passed right by Clarendon without seeing the spot to pull off. I was descending the hill into Clarendon proper when I realized that I had missed it. By then it was too late, so I continued on.

Much internal debate followed. Should I go into Wirral or Hoyt to shoot the train passing the sidings there? Both are a fair ways off the road so I would lose time. Enniskillen was another possibility but that is even farther away from the highway.

In the end, I elected to stay on the highway and proceed to Central Blissville and wait at the highway crossing. I don’t think I’ve ever photographed a train there so I wanted to try it out.

I had plenty of time to stand out in the rain and wait for the train… and I certainly did not trespass.

Apparently the woods are part of the CFB Gagetown training area. One should not wander through there, given that they do live fire exercises and there’s probably a few unexploded shells lying around still. I remember a friend of mine telling me about his job finding and detonating those unexploded shells. I’m glad that I sit behind a desk for my job.

The train ambled through at 3:52 PM, passing the mile 40 mileboard.

I feel like this location would be better for eastbound trains.

I don’t know why the equipment box says “5634” on it. I assume that’s some kind of serial number unrelated to the railway mileage.

In Fredericton Junction, many railfans take a photo of the train on the bridge crossing the river, so I wanted to do that too. I think it’s “Frank Nason’s Brook” but I could be wrong on its name.

It was a challenge to get there ahead of the train, but fortunately the road construction had wrapped up for the day and the stoplights were gone. I still had to slow down to 30 km/hr for the school zone but I was able to park on the side of the road and run across and still beat the train by a good ten seconds.

By this time (4 PM), it was getting a little dark and I was getting a little tired. I shot the above photo at ISO 1600, f/7.1, 1/160s and it was only going to get darker.

I decided to go to the “end of pavement” at Vespra and wait for the train there. I’ve photographed NBSR trains there in the past so it was a return to old times.

What I didn’t count on was how far away it was. It’s a good 12 km on back roads – paved, fortunately – and the train took what seemed like forever to get there.

It didn’t help that I was standing outside as the rain grew more and more intense. I had my camera tucked into my coat, and my left arm was shielding my phone on the tripod from the worst of the rain.

The train took almost 30 minutes to cover that 12 km. Long before the train appeared, I heard the engines working hard.

Finally at 4:28 PM, the train appeared through the pouring rain.

I’m sure the crew were shaking their heads in the cab at the idiot railfan getting soaked, but they gave me a little “toot toot too” with the horn after they finished blowing for the crossing.

132 cars later, NBSR 121 carried on toward Harvey and McAdam and points beyond, and I carried on back to my hotel to change out of my wet clothes.

3 thoughts on “Chasing NBSR 121”

  1. Great coverage of the NBSR train Steve; sorry you got soaked to get it. We railfans check the place for good shots, make sure a train is coming, and never bother to check the weather ! What the heck, we’re going anyway.

    Thanks for the story on Butt’s Station; as a history buff I found it super interesting.

    Steve.

    Reply

Leave a Comment