CP Havelock Subdivision

The CP Havelock subdivision is part of an internal CPKC short line, the Kawartha Lakes Railway, that operates between Toronto and Blue Mountain through Peterborough and Havelock. More information on Havelock can be found here.

MileStationSidings
90.8Beginning of track–
93.7HAVELOCK
Junction with Nephton Subdivision
–
94.4Begin Main Track–
116.7BOTULF1,984
117.1Interlocked drawbridge–
118.0PETERBOROUGH–
127.0CAVAN2,390
157.3MYRTLE1,960
176.92CN York Subdivision overhead–
178.0TORONTO YARD
Junction with CP Belleville sub
Yard

Today’s Havelock subdivision is a small portion of the original. The line originally ran from Glen Tay through Havelock to Toronto, as two subdivisions: the Havelock sub between Glen Tay and Havelock, and the Peterboro subdivision between Havelock and Agincourt (Toronto).

The November 22, 1931 timetable below shows the Havelock subdivision (Glen Tay to Havelock), which has all been abandoned. There is still CPKC track in Glen Tay, running through Perth to Smith Falls.

CPR Havelock subdivision, November 22, 1931
CPR Peterboro subdivision, November 22, 1931

There has been talk of restoring track between Glen Tay and Havelock for use by VIA Rail. Time will tell.

This is an excerpt from the May 28, 2008 CP timetable showing the Havelock subdivision.

CP Havelock subdivision, May 28, 2008

Back to CP in Ontario

2 thoughts on “CP Havelock Subdivision”

Comments are closed.