CN Elrose Subdivision

The CN Elrose subdivision ran from Conquest Junction to Glidden in Saskatchewan. It was taken over by Big Sky Rail in 2011.

The data for this page comes from the December 15, 2007 CN employee timetable.

Mile Station Siding
0.0 CONQUEST JCT WEST
0.5 Junction with CN Conquest subdivision
22.3 DINSMORE
31.3 WISETON
44.2 HUGHTON
49.8 ELROSE
55.9 MATADOR
Matador spur extends 29.7 miles southward
70.0 PLATO
76.9 RICHLEA
80.0 RITA
84.2 ESTON
White Bear spur extends 24.2 miles
84.4 ESTON
87.0 CHARLIE
91.0 SNIPE LAKE
103.4 ROBERT
104.2 GLIDDEN
Mantario spur extends 21.6 miles northward. Mileage 43.8 of spur is at Glidden. End of operated track on the spur is mile 22.2

The maximum speed limit on the CN Elrose subdivision was 30 MPH. The heaviest car permitted was 268,000 lbs.

The subdivision operated under the Occupancy Control System (OCS).