CP Varcoe Subdivision

The CP Varcoe subdivision ran from MacGregor to Varcoe, Manitoba. This branch line was abandoned in 1978.

The following information is from the CP October 27,1974 employee timetable.

MileStationSiding
0.0MACGREGOR–
3.1Crossing of CN Rivers subdivision–
11.0PINE CREEK–
17.3EDRANS–
26.7WELLWOOD
Grain elevator
–
29.4Crossing of CN Neepawa Subdivision–
33.5OBERON
Grain elevator
–
36.9BROOKDALE
Grain elevator
–
47.0MOOREPARK
Grain elevator
–
55.5VARCOE
Junction with CP Miniota Subdivision (formerly known as CP Rapid City)
–

In 1974 the speed limit over the entire subdivision was 15 MPH.