CP Emerson Subdivision

The CP Emerson subdivision runs from Winnipeg, MB to the Canada-USA border at Emerson, MB. This is CP’s connection with BNSF in North Dakota.

There are a few customers on the line, but most trains are through trains going to or from the USA.

MileStationSiding
0.0WHITTIER (Winnipeg)
Junction with CP Keewatin subdivision
–
0.28Crossing of CN Redditt subdivision–
1.1Crossing of CN St. Boniface lead–
9.3GRANDE POINTE8327 feet
15.9Hotbox–
21.0NIVERVILLE
Grain elevators
–
28.5OTTERBURNE–
32.2CAREY–
37.0DUFROST9671 feet
42.6Hotbox–
45.9ARNAUD–
53.9DOMINION CITY–
60.6FREDENSTHAL WEST
Grain elevator
–
63.8EMERSONYard
64.1International BoundaryYard
Grande Pointe on the CP Emerson subdivision
Grande Pointe on the CP Emerson subdivision

The maximum speed limit on the CP Emerson subdivision is 40 MPH. There is no maximum car tonnage specified in the employee timetable.

The subdivision operates under the Occupancy Control System (OCS) between mile 3.0 and the station sign at Fredensthal West.
At Noyes, just across the border in North Dakota, CP interchanges with the BNSF Railway.

Back to CP in Manitoba

2 thoughts on “CP Emerson Subdivision”

Comments are closed.