CP Emerson Subdivision

The CP Emerson subdivision runs from Winnipeg, MB to the Canada-USA border at Emerson, MB. This is CP’s connection with BNSF in North Dakota.

There are a few customers on the line, but most trains are through trains going to or from the USA.

Mile Station Siding
0.0 WHITTIER (Winnipeg)
Junction with CP Keewatin subdivision
0.28 Crossing of CN Redditt subdivision
1.1 Crossing of CN St. Boniface lead
9.3 GRANDE POINTE 8327 feet
15.9 Hotbox
21.0 NIVERVILLE
Grain elevators
28.5 OTTERBURNE
32.2 CAREY
37.0 DUFROST 9671 feet
42.6 Hotbox
45.9 ARNAUD
53.9 DOMINION CITY
60.6 FREDENSTHAL WEST
Grain elevator
63.8 EMERSON Yard
64.1 International Boundary Yard
Grande Pointe on the CP Emerson subdivision
Grande Pointe on the CP Emerson subdivision

The maximum speed limit on the CP Emerson subdivision is 40 MPH. There is no maximum car tonnage specified in the employee timetable.

The subdivision operates under the Occupancy Control System (OCS) between mile 3.0 and the station sign at Fredensthal West.
At Noyes, just across the border in North Dakota, CP interchanges with the BNSF Railway.

Back to CP in Manitoba

2 Replies to “CP Emerson Subdivision”

Comments are closed.