CN Bruce Lake Subdivision

The Bruce Lake subdivision ran 66.3 miles between Bruce Lake Junction (known as Amesdale on the CN Redditt subdivision) and Bruce Lake. It was abandoned sometime between May 1, 1988 and October 30, 1988.

MileStationSiding
0.0BRUCE LAKE JCT–
0.7North Amesdale siding2,179′
16.4THADDEUS2,810′
34.2WABASKANG2,870′
50.0Team Track87′
50.2EAR FALLSYard
65.8Canadian Industries Ltd. spur605′
66.3BRUCE LAKEYard

Back to CN in Ontario

2 thoughts on “CN Bruce Lake Subdivision”

  1. An interesting spur line. I am wondering if any of the trains were mixed so that employees could get to the mine. It was rather isolated even though it paralleled Highway 105 much of the way. Highway 105 was only paved in 1963. I have never seen any photos shot on this line.

    Reply
  2. Was there ever a Mixed Train service offered on this spur line to take workers to the Mine?
    It is an interesting fairly lengthy spur that one seldom hears about.

    Reply

Leave a Comment